Welcome to  Shandong Mason Environmental Protection Technology Co., Ltd.!---Focus on the field of prefabricated green building products!

1
1

1

2
2

2

3
3

3

4
4

4

Products

Current location:
Homepage
>
>
Prefabricated green building-steel concrete villa series
Number of views:
1000

Prefabricated green building-steel concrete villa series

装配式绿色建筑钢混装配式别墅系列: 1-6层独栋或联排装配式别墅,应用国家JGJ227-2011低层冷弯薄壁型钢房屋建筑技术规程、JGJ383-2016轻钢轻混凝土结构技术规程及MS轻钢格构现浇(或预制)泡沫混凝土复合墙体Q/XLQ666789-2015,图纸审查、工程验收均符合国家标准。分现场现浇和工厂预制两种做法,其特点,钢结构和保温防火混凝土墙体融为一体,外部不漏钢,钢材包覆在水泥里面,永远不锈蚀,延长了钢结构的使用寿命。墙面混凝土厚度达到30-50mm,可钉、可挂、可打膨胀螺栓、隔声、保温、防水、防火等指标均超过国家标准,是被动房屋建筑的首选技术,整体寿命达百年以上,建设工期缩短一倍以上,符合产业政策,可享受国家补贴。可以根据世界各地不同风格,设计生产施工,适用于任何国家和地区。因自身具有结构性能,属于无机材料,可与各种装饰材料相匹配衔接,解决了钢结构维护体系冷热桥问题。形成无机真空维护体系,杜绝冷热通道,还增加了气密性,解决了防腐问题,水电暖等管线均可以在墙体及地面内埋设。 我公司自设计、生产、施工直至交钥匙全方位服务,国内外均可承接业务,也可以提供技术和材料,由客户自己施工,其建设成本不受工程所在地的运距的影响。
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
Description
Parameters

Single-family or row prefabricated villas with 1-6 floors, applying national JGJ227-2011 low-rise cold-formed thin-wall steel building technical regulations, JGJ383-2016 light steel light concrete structure technical regulations and MS light steel lattice structure cast-in-place (or prefabricated ) Foam concrete composite wall Q/XLQ666789-2015, drawing review and project acceptance are in line with national standards. There are two methods of cast-in-place and factory prefabrication. Its characteristics are that the steel structure and the thermal insulation and fire-proof concrete wall are integrated. The external steel does not leak. The steel is covered in the cement and will never rust, which extends the service life of the steel structure. The wall concrete thickness reaches 30-50mm, and the indicators such as nailable, hangable, expandable bolts, sound insulation, heat preservation, waterproof, fireproof, etc. exceed national standards. It is the preferred technology for passive house construction. The overall life span is more than one hundred years. The construction period has been shortened by more than one time, which is in line with industrial policies and can enjoy state subsidies. It can be designed, produced and constructed according to different styles all over the world, suitable for any country and region. Because of its structural properties, it is an inorganic material, which can be matched and connected with various decorative materials, which solves the problem of hot and cold bridges in the steel structure maintenance system. An inorganic vacuum maintenance system is formed to prevent hot and cold passages, increase air-tightness, and solve the problem of anti-corrosion. Pipelines such as water, electricity and heating can be buried in the wall and the ground.

Our company has a full range of services from design, production, construction to turnkey. We can undertake business at home and abroad, and we can also provide technology and materials for construction by the customer. The construction cost is not affected by the distance of the project.

We could not find any corresponding parameters, please add them to the properties table
Previous
Next

Related products

Tips: Is the interface agent the same as the interface mortar?
For example: (1) Porous and strong water-absorbing materials (aerated concrete, gypsum board, wood, etc.); (2) Smooth and low-water-absorbing materials (cast concrete, etc.)
[Construction] Flat coating construction process of elastic coating for exterior wall
Let the new cement on the wall mature for at least one month to reduce the alkalinity of the wall appropriately and make the wall dry. The moisture content of the wall must be less than 10%; if the ambient temperature is low, the wall is ready to dry The time has been extended accordingly.
The quality supervision department has taken action, and the public wall requires the use of water-resistant putty
Shandong Weihai Quality Supervision Station requires that from October 1, 2016, the stairwells and corridors of new residential construction projects need to be scraped on the walls of public parts on the ground
【Construction】Scrape putty in this way so that the wall will not be hollow and cracked
The putty layer is hollow and blistered, mainly due to the presence of gas between the base layer and the putty layer. There is a dense layer between the base layer and the putty layer.

Intersection of Sanyi Street and Renhe Road, Eastern Development Zone, Pingyuan County, Dezhou City, Shandong Province

Online Messages

Username used for comment:
Online Messages
Description:

版权信息

Time of issue:2020-12-29 13:52:21

© 2020 Shandong Mason Environmental Protection Technology Co., Ltd. All Rights Reserved ICP:鲁ICP备0808751号  Powered by www.300.cn